Garage Floors a-z by Stamped Concrete

Once the foundation is done fill it with "road base" gravel to the desired level leaving enough space for concrete an average of 4 inches. Than start drilling the two inch deep holes in the foundation every 2 feet for the half inch rebar. (make sure its couple inches below the desired concrete height) (You also can go with wire mash which gives extra strength to the concrete floor) Insert the rebar in the wholes than tie them together to give extra strength to the garage floor.
Pour the concrete preferably use a concrete pump, than finish the surface smooth either by hand trowel, or for long lasting hard polished product, use a power trowel.  by John Tar
for more information on garage floors, and stamped concrete relater projects
Call John at (604) 377 3657 or visit Stamped Concrete